Barley Box DB1001 installs third-party applications via USB stick
Feature: ess container, bess, commercial battery,battery container,Marine battery Shenzhen Enershare Technology Co.,Ltd , https://www.enersharepower.com
Installation process 1 Download the sofa butler installation file to the U disk → 2U disk to insert the barley box USB interface → 3 local play Open the installation file → 4 installation is successful
Steps
1. Baidu search for "sofa manager" into the sofa network, download the sofa butler package; or directly click the link (http://app.shafa.com/shafa.apk) to download the sofa butler package.
Copy the downloaded apk installation package to the U disk.
3, enter the external storage;
4, find the sofa butler installation file, press the remote control confirmation key, that can be installed;
5. During installation, please wait for 1-3 minutes;
6. The barley box DB1001 completes the installation of the sofa butler.
If you still can not read the U disk, it is recommended to format the U disk to FAT32 format (if there are other contents in the U disk, export and then format), or try another U disk.
If the installation fails, restart the device and try again by following the steps (may be useful). Still have questions please add the official QQ group below.
1.Superior uniformity and EV grade safefty LFP battery ;
2.Customized modular and large-scale ESS solution;
3.Reliable safety design and remote real-time monitoring;
4.High cost effective and short delivery duration.